Deutsch

Corporate history

2025

Neues V+P Headquarter

New V+P Headquarters

For the first time in the company’s history, all employees are coming together under one roof in Vienna’s central 2nd district.

2022

Expansion of Management Team

Managing partners: Oliver Gusella, Manuel Hajek, Carl Thümecke, Günther Sammer, Christian Marintschnig, Arnold Vielgut and Thomas Wetzstein

2021

45 Years of VASKO+PARTNER

Everything from a single source. In 2021, Vasko+Partner celebrated its 45th anniversary – unfortunately without guests due to Covid-19, but with a fantastic team, excellent business partners, and challenging projects.

2020

Biology Center, University of Vienna – St. Marx

The new Biology Center of the University of Vienna was built on a site of approximately 12,000 square meters along Schlachthausgasse in St. Marx. V+P, in partnership with Backhaus Liebner, was responsible for the general planning.

2019

Campus Berresgasse

With the Education Campus Berresgasse, a high-quality location for playing and learning was created for around 1,100 children. The design was created by PSLA Architekten.

2018

Weltmuseum Wien

Weltmuseum Wien – one of the world‘s most important ethnographic museums – was completely redeveloped. Architecture: Hoskins Architects Exhibition design: Ralph Appelbaum Associates Lighting and media equipment planning; instrumentation and control systems; drawings, specifications, and documentation for building permission application; building services design; construction site supervision including services under the Austrian Construction Work Coordination Act (BauKG): Vasko+Partner

 

2016

RHW.2

RHW.2

With the RHW.2 Raiffeisenhaus extension, Vasko+Partner sets the bar high for follow-up projects: the office building generates more energy than it can consume. The architectural design is by Atelier Hayde Architekten, Architektur Maurer.

2014

Parlament

Overall refurbishment of Austrian Parliament Building

Vasko+Partner presents several versions for the overall refurbishment of the Austrian Parliament Building. After an EU-wide multi-stage tender procedure, V+P is contracted for project control services.

2013

Geschäftsführung

Expansion of management team

Managing partners: Christian Marintschnig, Günther Sammer, Wolfgang Poppe, Arnold Vielgut and Thomas Wetzstein

 

2013

Campus Wu

Campus WU

Six buildings, five architectural teams: Vasko+Partner, acting as Generalkonsulent, coordinates the WU (Vienna University of Economics and Business) Campus project.

 

2004

Slovak Savings Bank, Bratislava
Slovak Savings Bank, Bratislava

GENERALKONSULENT

Vasko+Partner establishes the term Generalkonsulent to refer to its multi-disciplinary team of consultants and the holistic concept which they pursue and which allows for projects to be executed in one go from design to completion in close interchange with architects.

2000

T-Center, Wien
T-Center, Wien

Building Services Engineering

Vasko+Partner strengthens its competency by introducing building services engineering as a discipline into the company and thus secures its reputation as an esteemed partner of numerous architectural and planning offices.

 

1996

Project Management

Vasko+Partner establishes project management as a separate discipline.

 

1994

Schule Waidhausenstraße, Wien
Schule Waidhausenstraße, Wien

Foundation of Vasko+Partner ZT GesmbH

Foundation of Vasko+Partner ZT GesmbH with Wolfgang Vasko and Wolfgang Poppe as managing partners

 

1985

Staatsoper Wien

Vienna State Opera

Structural engineering know-how for the Vienna State Opera: Vasko+Partner is responsible for the stage boxes at the Opera Ball.

 

1976

Wolfgang Vasko
Wolfgang Vasko

Wolfgang Vasko founds firm of chartered construction engineering consultants

In 1976, Wolfgang Vasko founds his firm of chartered construction engineering consultants with offices in Eisenstadt and Vienna and a focus on structural engineering. Shortly thereafter, building physics and construction management are added to the company's core competency.